Shift pattern calendar generator

Make a repeating shift calendar for up to six crews.

2027 · 1 crew

Starts

Crew A

Your pattern

8-day cycle: 4 work days, then 4 off.

D day, N night, M morning, E afternoon, O off. Editing switches to a custom pattern.

Cycle length: 8 days

Crews 1
Crews
Shift times (optional)

Example: Edit settings to personalise.

Save and export your calendar

Export year
Download options

Print and exports include the full year.

Weekly calendar

28 Dec 2026 to 3 Jan 2027

Each row shows the assignments for that date.

  1. Outside 2027
  2. Outside 2027
  3. Outside 2027
  4. Outside 2027
  5. Before the start date
  6. Before the start date
    • Crew A: Day

January 2027

January 2027
SunMonTueWedThuFriSat
January 1, 2027: Before the start dateJanuary 2, 2027: Before the start date
January 3, 2027: Crew A: Day shiftJanuary 4, 2027: Crew A: Day shiftJanuary 5, 2027: Crew A: Day shiftJanuary 6, 2027: Crew A: Day shiftJanuary 7, 2027: Crew A: OffJanuary 8, 2027: Crew A: OffJanuary 9, 2027: Crew A: Off
January 10, 2027: Crew A: OffJanuary 11, 2027: Crew A: Day shiftJanuary 12, 2027: Crew A: Day shiftJanuary 13, 2027: Crew A: Day shiftJanuary 14, 2027: Crew A: Day shiftJanuary 15, 2027: Crew A: OffJanuary 16, 2027: Crew A: Off
January 17, 2027: Crew A: OffJanuary 18, 2027: Crew A: OffJanuary 19, 2027: Crew A: Day shiftJanuary 20, 2027: Crew A: Day shiftJanuary 21, 2027: Crew A: Day shiftJanuary 22, 2027: Crew A: Day shiftJanuary 23, 2027: Crew A: Off
January 24, 2027: Crew A: OffJanuary 25, 2027: Crew A: OffJanuary 26, 2027: Crew A: OffJanuary 27, 2027: Crew A: Day shiftJanuary 28, 2027: Crew A: Day shiftJanuary 29, 2027: Crew A: Day shiftJanuary 30, 2027: Crew A: Day shift
January 31, 2027: Crew A: Off
Work dayOff day
February 2027
SunMonTueWedThuFriSat
February 1, 2027: Crew A: OffFebruary 2, 2027: Crew A: OffFebruary 3, 2027: Crew A: OffFebruary 4, 2027: Crew A: Day shiftFebruary 5, 2027: Crew A: Day shiftFebruary 6, 2027: Crew A: Day shift
February 7, 2027: Crew A: Day shiftFebruary 8, 2027: Crew A: OffFebruary 9, 2027: Crew A: OffFebruary 10, 2027: Crew A: OffFebruary 11, 2027: Crew A: OffFebruary 12, 2027: Crew A: Day shiftFebruary 13, 2027: Crew A: Day shift
February 14, 2027: Crew A: Day shiftFebruary 15, 2027: Crew A: Day shiftFebruary 16, 2027: Crew A: OffFebruary 17, 2027: Crew A: OffFebruary 18, 2027: Crew A: OffFebruary 19, 2027: Crew A: OffFebruary 20, 2027: Crew A: Day shift
February 21, 2027: Crew A: Day shiftFebruary 22, 2027: Crew A: Day shiftFebruary 23, 2027: Crew A: Day shiftFebruary 24, 2027: Crew A: OffFebruary 25, 2027: Crew A: OffFebruary 26, 2027: Crew A: OffFebruary 27, 2027: Crew A: Off
February 28, 2027: Crew A: Day shift
Work dayOff day
March 2027
SunMonTueWedThuFriSat
March 1, 2027: Crew A: Day shiftMarch 2, 2027: Crew A: Day shiftMarch 3, 2027: Crew A: Day shiftMarch 4, 2027: Crew A: OffMarch 5, 2027: Crew A: OffMarch 6, 2027: Crew A: Off
March 7, 2027: Crew A: OffMarch 8, 2027: Crew A: Day shiftMarch 9, 2027: Crew A: Day shiftMarch 10, 2027: Crew A: Day shiftMarch 11, 2027: Crew A: Day shiftMarch 12, 2027: Crew A: OffMarch 13, 2027: Crew A: Off
March 14, 2027: Crew A: OffMarch 15, 2027: Crew A: OffMarch 16, 2027: Crew A: Day shiftMarch 17, 2027: Crew A: Day shiftMarch 18, 2027: Crew A: Day shiftMarch 19, 2027: Crew A: Day shiftMarch 20, 2027: Crew A: Off
March 21, 2027: Crew A: OffMarch 22, 2027: Crew A: OffMarch 23, 2027: Crew A: OffMarch 24, 2027: Crew A: Day shiftMarch 25, 2027: Crew A: Day shiftMarch 26, 2027: Crew A: Day shiftMarch 27, 2027: Crew A: Day shift
March 28, 2027: Crew A: OffMarch 29, 2027: Crew A: OffMarch 30, 2027: Crew A: OffMarch 31, 2027: Crew A: Off
Work dayOff day
April 2027
SunMonTueWedThuFriSat
April 1, 2027: Crew A: Day shiftApril 2, 2027: Crew A: Day shiftApril 3, 2027: Crew A: Day shift
April 4, 2027: Crew A: Day shiftApril 5, 2027: Crew A: OffApril 6, 2027: Crew A: OffApril 7, 2027: Crew A: OffApril 8, 2027: Crew A: OffApril 9, 2027: Crew A: Day shiftApril 10, 2027: Crew A: Day shift
April 11, 2027: Crew A: Day shiftApril 12, 2027: Crew A: Day shiftApril 13, 2027: Crew A: OffApril 14, 2027: Crew A: OffApril 15, 2027: Crew A: OffApril 16, 2027: Crew A: OffApril 17, 2027: Crew A: Day shift
April 18, 2027: Crew A: Day shiftApril 19, 2027: Crew A: Day shiftApril 20, 2027: Crew A: Day shiftApril 21, 2027: Crew A: OffApril 22, 2027: Crew A: OffApril 23, 2027: Crew A: OffApril 24, 2027: Crew A: Off
April 25, 2027: Crew A: Day shiftApril 26, 2027: Crew A: Day shiftApril 27, 2027: Crew A: Day shiftApril 28, 2027: Crew A: Day shiftApril 29, 2027: Crew A: OffApril 30, 2027: Crew A: Off
Work dayOff day
May 2027
SunMonTueWedThuFriSat
May 1, 2027: Crew A: Off
May 2, 2027: Crew A: OffMay 3, 2027: Crew A: Day shiftMay 4, 2027: Crew A: Day shiftMay 5, 2027: Crew A: Day shiftMay 6, 2027: Crew A: Day shiftMay 7, 2027: Crew A: OffMay 8, 2027: Crew A: Off
May 9, 2027: Crew A: OffMay 10, 2027: Crew A: OffMay 11, 2027: Crew A: Day shiftMay 12, 2027: Crew A: Day shiftMay 13, 2027: Crew A: Day shiftMay 14, 2027: Crew A: Day shiftMay 15, 2027: Crew A: Off
May 16, 2027: Crew A: OffMay 17, 2027: Crew A: OffMay 18, 2027: Crew A: OffMay 19, 2027: Crew A: Day shiftMay 20, 2027: Crew A: Day shiftMay 21, 2027: Crew A: Day shiftMay 22, 2027: Crew A: Day shift
May 23, 2027: Crew A: OffMay 24, 2027: Crew A: OffMay 25, 2027: Crew A: OffMay 26, 2027: Crew A: OffMay 27, 2027: Crew A: Day shiftMay 28, 2027: Crew A: Day shiftMay 29, 2027: Crew A: Day shift
May 30, 2027: Crew A: Day shiftMay 31, 2027: Crew A: Off
Work dayOff day
June 2027
SunMonTueWedThuFriSat
June 1, 2027: Crew A: OffJune 2, 2027: Crew A: OffJune 3, 2027: Crew A: OffJune 4, 2027: Crew A: Day shiftJune 5, 2027: Crew A: Day shift
June 6, 2027: Crew A: Day shiftJune 7, 2027: Crew A: Day shiftJune 8, 2027: Crew A: OffJune 9, 2027: Crew A: OffJune 10, 2027: Crew A: OffJune 11, 2027: Crew A: OffJune 12, 2027: Crew A: Day shift
June 13, 2027: Crew A: Day shiftJune 14, 2027: Crew A: Day shiftJune 15, 2027: Crew A: Day shiftJune 16, 2027: Crew A: OffJune 17, 2027: Crew A: OffJune 18, 2027: Crew A: OffJune 19, 2027: Crew A: Off
June 20, 2027: Crew A: Day shiftJune 21, 2027: Crew A: Day shiftJune 22, 2027: Crew A: Day shiftJune 23, 2027: Crew A: Day shiftJune 24, 2027: Crew A: OffJune 25, 2027: Crew A: OffJune 26, 2027: Crew A: Off
June 27, 2027: Crew A: OffJune 28, 2027: Crew A: Day shiftJune 29, 2027: Crew A: Day shiftJune 30, 2027: Crew A: Day shift
Work dayOff day
July 2027
SunMonTueWedThuFriSat
July 1, 2027: Crew A: Day shiftJuly 2, 2027: Crew A: OffJuly 3, 2027: Crew A: Off
July 4, 2027: Crew A: OffJuly 5, 2027: Crew A: OffJuly 6, 2027: Crew A: Day shiftJuly 7, 2027: Crew A: Day shiftJuly 8, 2027: Crew A: Day shiftJuly 9, 2027: Crew A: Day shiftJuly 10, 2027: Crew A: Off
July 11, 2027: Crew A: OffJuly 12, 2027: Crew A: OffJuly 13, 2027: Crew A: OffJuly 14, 2027: Crew A: Day shiftJuly 15, 2027: Crew A: Day shiftJuly 16, 2027: Crew A: Day shiftJuly 17, 2027: Crew A: Day shift
July 18, 2027: Crew A: OffJuly 19, 2027: Crew A: OffJuly 20, 2027: Crew A: OffJuly 21, 2027: Crew A: OffJuly 22, 2027: Crew A: Day shiftJuly 23, 2027: Crew A: Day shiftJuly 24, 2027: Crew A: Day shift
July 25, 2027: Crew A: Day shiftJuly 26, 2027: Crew A: OffJuly 27, 2027: Crew A: OffJuly 28, 2027: Crew A: OffJuly 29, 2027: Crew A: OffJuly 30, 2027: Crew A: Day shiftJuly 31, 2027: Crew A: Day shift
Work dayOff day
August 2027
SunMonTueWedThuFriSat
August 1, 2027: Crew A: Day shiftAugust 2, 2027: Crew A: Day shiftAugust 3, 2027: Crew A: OffAugust 4, 2027: Crew A: OffAugust 5, 2027: Crew A: OffAugust 6, 2027: Crew A: OffAugust 7, 2027: Crew A: Day shift
August 8, 2027: Crew A: Day shiftAugust 9, 2027: Crew A: Day shiftAugust 10, 2027: Crew A: Day shiftAugust 11, 2027: Crew A: OffAugust 12, 2027: Crew A: OffAugust 13, 2027: Crew A: OffAugust 14, 2027: Crew A: Off
August 15, 2027: Crew A: Day shiftAugust 16, 2027: Crew A: Day shiftAugust 17, 2027: Crew A: Day shiftAugust 18, 2027: Crew A: Day shiftAugust 19, 2027: Crew A: OffAugust 20, 2027: Crew A: OffAugust 21, 2027: Crew A: Off
August 22, 2027: Crew A: OffAugust 23, 2027: Crew A: Day shiftAugust 24, 2027: Crew A: Day shiftAugust 25, 2027: Crew A: Day shiftAugust 26, 2027: Crew A: Day shiftAugust 27, 2027: Crew A: OffAugust 28, 2027: Crew A: Off
August 29, 2027: Crew A: OffAugust 30, 2027: Crew A: OffAugust 31, 2027: Crew A: Day shift
Work dayOff day
September 2027
SunMonTueWedThuFriSat
September 1, 2027: Crew A: Day shiftSeptember 2, 2027: Crew A: Day shiftSeptember 3, 2027: Crew A: Day shiftSeptember 4, 2027: Crew A: Off
September 5, 2027: Crew A: OffSeptember 6, 2027: Crew A: OffSeptember 7, 2027: Crew A: OffSeptember 8, 2027: Crew A: Day shiftSeptember 9, 2027: Crew A: Day shiftSeptember 10, 2027: Crew A: Day shiftSeptember 11, 2027: Crew A: Day shift
September 12, 2027: Crew A: OffSeptember 13, 2027: Crew A: OffSeptember 14, 2027: Crew A: OffSeptember 15, 2027: Crew A: OffSeptember 16, 2027: Crew A: Day shiftSeptember 17, 2027: Crew A: Day shiftSeptember 18, 2027: Crew A: Day shift
September 19, 2027: Crew A: Day shiftSeptember 20, 2027: Crew A: OffSeptember 21, 2027: Crew A: OffSeptember 22, 2027: Crew A: OffSeptember 23, 2027: Crew A: OffSeptember 24, 2027: Crew A: Day shiftSeptember 25, 2027: Crew A: Day shift
September 26, 2027: Crew A: Day shiftSeptember 27, 2027: Crew A: Day shiftSeptember 28, 2027: Crew A: OffSeptember 29, 2027: Crew A: OffSeptember 30, 2027: Crew A: Off
Work dayOff day
October 2027
SunMonTueWedThuFriSat
October 1, 2027: Crew A: OffOctober 2, 2027: Crew A: Day shift
October 3, 2027: Crew A: Day shiftOctober 4, 2027: Crew A: Day shiftOctober 5, 2027: Crew A: Day shiftOctober 6, 2027: Crew A: OffOctober 7, 2027: Crew A: OffOctober 8, 2027: Crew A: OffOctober 9, 2027: Crew A: Off
October 10, 2027: Crew A: Day shiftOctober 11, 2027: Crew A: Day shiftOctober 12, 2027: Crew A: Day shiftOctober 13, 2027: Crew A: Day shiftOctober 14, 2027: Crew A: OffOctober 15, 2027: Crew A: OffOctober 16, 2027: Crew A: Off
October 17, 2027: Crew A: OffOctober 18, 2027: Crew A: Day shiftOctober 19, 2027: Crew A: Day shiftOctober 20, 2027: Crew A: Day shiftOctober 21, 2027: Crew A: Day shiftOctober 22, 2027: Crew A: OffOctober 23, 2027: Crew A: Off
October 24, 2027: Crew A: OffOctober 25, 2027: Crew A: OffOctober 26, 2027: Crew A: Day shiftOctober 27, 2027: Crew A: Day shiftOctober 28, 2027: Crew A: Day shiftOctober 29, 2027: Crew A: Day shiftOctober 30, 2027: Crew A: Off
October 31, 2027: Crew A: Off
Work dayOff day
November 2027
SunMonTueWedThuFriSat
November 1, 2027: Crew A: OffNovember 2, 2027: Crew A: OffNovember 3, 2027: Crew A: Day shiftNovember 4, 2027: Crew A: Day shiftNovember 5, 2027: Crew A: Day shiftNovember 6, 2027: Crew A: Day shift
November 7, 2027: Crew A: OffNovember 8, 2027: Crew A: OffNovember 9, 2027: Crew A: OffNovember 10, 2027: Crew A: OffNovember 11, 2027: Crew A: Day shiftNovember 12, 2027: Crew A: Day shiftNovember 13, 2027: Crew A: Day shift
November 14, 2027: Crew A: Day shiftNovember 15, 2027: Crew A: OffNovember 16, 2027: Crew A: OffNovember 17, 2027: Crew A: OffNovember 18, 2027: Crew A: OffNovember 19, 2027: Crew A: Day shiftNovember 20, 2027: Crew A: Day shift
November 21, 2027: Crew A: Day shiftNovember 22, 2027: Crew A: Day shiftNovember 23, 2027: Crew A: OffNovember 24, 2027: Crew A: OffNovember 25, 2027: Crew A: OffNovember 26, 2027: Crew A: OffNovember 27, 2027: Crew A: Day shift
November 28, 2027: Crew A: Day shiftNovember 29, 2027: Crew A: Day shiftNovember 30, 2027: Crew A: Day shift
Work dayOff day
December 2027
SunMonTueWedThuFriSat
December 1, 2027: Crew A: OffDecember 2, 2027: Crew A: OffDecember 3, 2027: Crew A: OffDecember 4, 2027: Crew A: Off
December 5, 2027: Crew A: Day shiftDecember 6, 2027: Crew A: Day shiftDecember 7, 2027: Crew A: Day shiftDecember 8, 2027: Crew A: Day shiftDecember 9, 2027: Crew A: OffDecember 10, 2027: Crew A: OffDecember 11, 2027: Crew A: Off
December 12, 2027: Crew A: OffDecember 13, 2027: Crew A: Day shiftDecember 14, 2027: Crew A: Day shiftDecember 15, 2027: Crew A: Day shiftDecember 16, 2027: Crew A: Day shiftDecember 17, 2027: Crew A: OffDecember 18, 2027: Crew A: Off
December 19, 2027: Crew A: OffDecember 20, 2027: Crew A: OffDecember 21, 2027: Crew A: Day shiftDecember 22, 2027: Crew A: Day shiftDecember 23, 2027: Crew A: Day shiftDecember 24, 2027: Crew A: Day shiftDecember 25, 2027: Crew A: Off
December 26, 2027: Crew A: OffDecember 27, 2027: Crew A: OffDecember 28, 2027: Crew A: OffDecember 29, 2027: Crew A: Day shiftDecember 30, 2027: Crew A: Day shiftDecember 31, 2027: Crew A: Day shift
Work dayOff day

2027 shift calendar (Example schedule)

4 on 4 off pattern, 8-day cycle. Starts Sunday, 3 January 2027.

  • ACrew A183 work days in 2027183 day shifts
  • DDay shift
  • OOff

Each date shows the working crew and shift type.Day codes follow crew order: A B C, then D E F. Blank days are before the start date.

For general information only, not professional advice. Check the official sources below. Use your own judgement and speak to your employer or HR team before you act.

2027 shift calendar (Example schedule)

  • ACrew A

2027 shift calendar (Example schedule)

  • ACrew A

2027 shift calendar (Example schedule)

  • ACrew A

2027 shift calendar (Example schedule)

  • ACrew A

2027 shift calendar (Example schedule)

  • ACrew A
  • ACrew A183 work days in 2027183 day shifts
  • DDay shift
  • OOff

Each date shows the working crew and shift type.Day codes follow crew order: A B C, then D E F. Blank days are before the start date.

For general information only, not professional advice. Check the official sources below. Use your own judgement and speak to your employer or HR team before you act.

How to use your calendar

  1. On a phone or tablet, select Edit settings to open the form.
  2. Choose a preset such as 4 on 4 off or DuPont, or choose Custom and type your own pattern.
  3. Enter the date your pattern starts. This is the first day of the cycle for your first crew.
  4. Add crews if you need them. Each crew's offset is how many days later its cycle starts.
  5. Pick the year to show. Days before the start date stay blank.
  6. Turn on shift times if you want timed events in your calendar file instead of all-day events.
  7. Print the year, save it on this device, share a link, or download a calendar file for each crew.

How it works

4 on 4 off example: 8-day cycle
  1. Day shift · 4 days
  2. Off · 4 days

A shift pattern is a list of day codes that repeats. D is a day shift, N is a night shift, M is a morning shift, E is an afternoon shift and O is a day off. The 4 on 4 off example above has an eight-day cycle.

For every date, the calendar works out where that date falls in the cycle: (date minus start date minus crew offset), divided by the cycle length, keeping the remainder. The remainder is the position in the pattern, and the code at that position is the shift for that day.

Dates are counted as whole calendar days, so time zones and clock changes never move a shift. Leap years are included: 29 February is a normal day in the cycle.

Work days are every day with a shift code (D, N, M or E). Days off and blank days before the start date are not counted.

Calendar files hold one event for each run of days with the same shift. Without shift times they are all-day events. With shift times, each run is one repeating event, and shifts that end at or before their start time finish the next day.

Worked example

4 on 4 off, one crew, starting Sunday, 3 January 2027, showing 2027:

  • January work days: 3 to 6, 11 to 14, 19 to 22, 27 to 30 (16 days).
  • 7 January is a day off.
  • 1 and 2 January are blank, because they are before the start date.
  • 183 work days in 2027.

See every preset pattern in our methodology

Common questions

What is a rotating shift pattern?

It is a fixed sequence of work days and days off that repeats, such as 4 days on and 4 days off. Because it repeats, you can work out any future date from the start date and the length of the cycle.

Can I add more than one crew?

Yes. You can add up to 6 crews. Each crew uses the same pattern with its own offset, the number of days its cycle starts after the first crew. Presets such as DuPont fill in the usual offsets for you.

How do I put my shifts on my phone?

Download the calendar file (.ics) for your crew, then open it or import it in your calendar app. Most phone and computer calendar apps can import .ics files.

Can I make my own pattern?

Yes. Choose Custom and type the day codes in order, for example DDNNOOOO for 2 days, 2 nights and 4 days off. Spaces and commas are ignored. A pattern can be up to 366 days long.

Why are days before my start date blank?

The calendar only knows your pattern from the start date onwards, so it does not guess earlier shifts. To fill in earlier days, enter an earlier date that matches the same point in your cycle.

Sources

Last checked: