| Cycle days | Assignment |
|---|---|
| 1 to 4 | Night |
| 5 to 7 | Off |
| 8 to 10 | Day |
| 11 | Off |
| 12 to 14 | Night |
| 15 to 17 | Off |
| 18 to 21 | Day |
| 22 to 28 | Off |
Follow every block in order
The full code string is NNNNOOODDDONNNOOODDDDOOOOOOO. Its 14 work positions and 14 off positions include both short gaps and one seven-day break. PHMSA published shift-plan discussion describes this 28-day, four-crew, 12-hour arrangement. This is a defined template, not a guarantee that every workplace using the name follows the same local arrangements.
Count cycle days from 1 when reading the table. The internal calculation starts at position 0, but that is simply another way of indexing the same sequence. Never start counting again on a Monday or at a new month unless the rotation really begins again there.
How the four crews fit together
With Crew A as the reference, the standard crew offsets are A 0, B 7, C 14 and D 21. On each date the calendar subtracts the crew’s offset from days since the anchor, then wraps the result into 28 positions. Crews therefore occupy different phases while sharing one cycle and date anchor.
An offset is not a personal availability date. For example, B’s first cycle position falls seven days after A’s, but B can still have assignments earlier in the visible schedule because its phase wraps. Dates before the common start are blank for every crew. Select another reference crew only when you know that crew’s first night in its four-night block.
| Shift type | January dates | Count |
|---|---|---|
| Night | 11, 12, 13, 14, 22, 23, 24 | 7 |
| Day | 18, 19, 20, 28, 29, 30, 31 | 7 |
Check Crew B in January 2027
Choose Crew A as reference, a start of 4 January 2027 and year 2027. Show all four crews. For B, the first seven scheduled dates, 4 to 10 January, are off. Its four-night block runs 11 to 14 January, followed by three off dates.
Crew B works days on 18 to 20 January, nights on 22 to 24 January, and days again on 28 to 31 January. That gives seven nights plus seven days, or 14 shifts in January. These checks exercise both the shift changes and the seven-day offset rather than verifying only a total.
Understand the long break and average hours
The seven off positions are cycle days 22 to 28, not a fixed week of every calendar month. With the example anchor, Crew A’s long break is 25 to 31 January and its next four-night block begins 1 February. Other crews reach that break on different dates.
At an assumed 12 hours per shift, a complete cycle contains 168 nominal hours, averaging 42 per week. Those averages exclude unpaid breaks, leave, overtime and shift swaps. The first date after a night block can still contain the end of the previous night’s shift. Off means no new scheduled shift starts on that date, not necessarily no work at any clock time.
Build a calendar that matches the official rota
Open the DuPont calendar, choose the reference crew and enter a confirmed first night. Rename crews, choose colours and set the year. Check the first four nights, the first day block and the seven-day break against your employer’s schedule. Hiding a crew changes what you see, not the anchor for the remaining crews.
Save on your device, share the checked settings or print the crew calendar. The tool offers calendar downloads for a single crew or all crews. Its day/night labels do not establish your employer’s exact start times. Confirm imported events, exceptions and actual duty times with your employer or HR team before using the result for commitments.
For general information only, not professional advice. Check the official sources below. Use your own judgement and speak to your employer or HR team before you act.
Common questions
Is the long break always at the end of the month?
No. It is at the end of each crew’s 28-day cycle. Its calendar dates move because months do not all contain 28 days.
Does each crew have 14 shifts every month?
No. Each complete cycle contains 14 shifts. A calendar month can include different partial cycles and, initially, blank dates before the start.
Can I change the sequence?
The dedicated calendar uses this documented DuPont template. If your actual sequence differs, enter the full sequence in the general shift pattern calendar.
Related information
Sources
Last checked:
