Read the eight-day sequence

The simplest day-shift version is DDDDOOOO: day shifts on cycle days 1 to 4, then off on days 5 to 8. Day 9 returns to day 1. The night version replaces D with N; the dates remain the same. This tool chooses one shift type for the working blocks rather than automatically alternating days and nights.

Because eight is not a multiple of seven, the start of each work block moves to the next weekday. A block starting Sunday is followed by one starting Monday, then Tuesday. Weekends are ordinary positions in the cycle, so do not assume every Saturday is off or copy one week across the year.

Spot checks with Crew A starting 3 January 2027
DateCrew ACrew B
7 JanuaryOffDay
1 MarchDayOff
25 DecemberOffDay

A checked 2027 example

Set the reference crew to A, its first workday to 3 January 2027, the year to 2027 and the shift type to Day. Crew A works 3 to 6, 11 to 14, 19 to 22 and 27 to 30 January: 16 shift-start dates. The first two January dates are blank because they precede the common start.

The annual count is 183 for A. Over the 363 scheduled dates from 3 January to 31 December, the engine fits 45 complete eight-day cycles plus three days. Each full cycle contributes four workdays and the final three positions are working, giving 180 + 3 = 183. A different anchor or a leap year can give a different count.

What a second crew changes

With A and B shown, B uses an offset of four days. B works the dates A is off, starting 7 January in this example. Across the scheduled part of 2027, A has 183 workdays and B has 180. Equal-sized cycles do not guarantee equal totals in a partial year.

This provides one working crew per date in the selected shift type. It does not by itself demonstrate round-the-clock coverage if each shift is only 12 hours. Staffing both days and nights may require additional crews or a different arrangement. Check the actual coverage requirement before treating the calendar as a staffing plan.

Separate average hours from dated hours

At 12 hours per shift with no unpaid break, the cycle contains 48 hours. Its weekly average is 48 divided by 8, multiplied by 7: 42 hours. The 365-day average is 2,190 hours. Neither is a guarantee of paid hours or the number of hours in every calendar week.

For Crew A’s dated example, 183 nominal 12-hour shifts total 2,196 scheduled hours. Leave, unpaid breaks, overtime and swaps can change an individual’s hours. The date on a cell means the shift starts that day; a night shift can continue into a date marked off for new starts. Ask your employer or HR team which hours and exceptions apply.

Make and check your own calendar

Open the 4 on 4 off calendar and use a known first workday for the reference crew. Choose A alone or A and B, set names and colours, and choose day or night shifts. Check the first off day and a date several months later against the official rota. Keep the anchor when changing the year.

Save locally to return on the same browser, share a checked settings link, or print the year. Download one crew or both as a calendar file if needed. Inspect imported events before relying on them. A pattern illustration does not assess workload or rest; HSE recommends assessing shift-work risks.

For general information only, not professional advice. Check the official sources below. Use your own judgement and speak to your employer or HR team before you act.

Common questions

Is it always 182.5 workdays a year?

That is half of a 365-day year as a mathematical average, not a possible whole-day calendar count. A dated calendar counts complete shift starts and depends on the anchor and covered range.

Does Crew B wait four days before it exists?

No. Offset 4 selects the opposite phase of the cycle. All dates before the common start are blank; after that start, both crews have either work or off assignments.

Can I alternate day and night blocks?

Use the general shift pattern calendar with your full agreed sequence. The dedicated 4 on 4 off calendar selects day or night for its working blocks.

Sources

Last checked: