| Cycle day | Assignment |
|---|---|
| 1 | 24-hour duty |
| 2 | Off |
| 3 | 24-hour duty |
| 4 | Off |
| 5 | 24-hour duty |
| 6 to 9 | Off |
Read the full nine-day template
The code string is DODODOOOO. D means a 24-hour duty period in this tool, not a 12-hour day shift. Duty starts are on cycle days 1, 3 and 5. Days 2 and 4 are single off positions, and days 6 to 9 form the four-day off run. The next cycle begins on day 10.
The single off date after a duty start can include the end of that 24-hour duty. If duty begins at 08:00, for example, an assignment starting 1 January finishes at 08:00 on 2 January. This 08:00 time illustrates the meaning of a duty day; it is not a claim about every department’s changeover time.
Do not confuse the template with a Kelly day
The name alone cannot tell you which schedule to enter. A department can describe separately allocated days off as Kelly days. As a documented local example, Mount Vernon’s 2024 to 2026 firefighter agreement sets Kelly-day selection within 28-day cycles. That agreement is a historical example of employer-specific terminology, not the rules for your 2027 calendar.
Ask for the full repeating work/off sequence and any separately scheduled exceptions. If it is not DODODOOOO, the dedicated Kelly calendar is not the right template. Use a matching pattern tool or a custom sequence where appropriate. Do not force a different department arrangement into nine days just because the name looks familiar.
| Cycle begins | Duty dates in January |
|---|---|
| 1 January | 1, 3, 5 |
| 10 January | 10, 12, 14 |
| 19 January | 19, 21, 23 |
| 28 January | 28, 30 |
Worked example: 1 January 2027 anchor
Set the start date to 1 January 2027, year to 2027 and one platoon at offset 0. The first three duty starts are 1, 3 and 5 January. The four-day off run is 6 to 9 January. New cycles begin on 10, 19 and 28 January.
The complete January duty list is 1, 3, 5, 10, 12, 14, 19, 21, 23, 28 and 30: 11 starts. Across 2027 this anchor gives 123 starts. That is 40 complete nine-day cycles with 120 duties, followed by five cycle days containing three more. The dated nominal total is 123 × 24 = 2,952 hours attributed to start dates.
Understand offsets and cycle averages
The default three-platoon setup uses offsets 0, 3 and 6 to stagger the phases. An offset of three selects another point in the repeating cycle; it does not leave that platoon unassigned for its first three days. Dates before the common start remain blank for all platoons.
A complete cycle has 72 nominal duty hours over nine calendar days. That averages 56 hours per week and 2,920 per 365-day year. The dated example’s 2,952 hours differs because a real year ends partway through a cycle. Neither number includes leave, separately allocated Kelly days, swaps or payroll treatment. A count of duty starts is not a determination of paid or overtime hours.
Build the calendar from a confirmed first duty
Open the Kelly calendar, enter a known first duty date, select the year and add the required platoons. Give them recognisable names and confirm each offset. Check the first five cycle positions and the long off run against the official schedule. Then check a later month to catch an incorrect cycle length or anchor.
Save on this device or share the settings once checked. Print the calendar or download one platoon or all platoons, checking the imported duty dates before use and confirming actual duty and changeover times separately. The template does not assess workload, fatigue or contractual compliance. Confirm exceptions and changeover details with your employer or HR team.
For general information only, not professional advice. Check the official sources below. Use your own judgement and speak to your employer or HR team before you act.
Common questions
Is this the same as 24/48?
No. This template has duty on days 1, 3 and 5 of nine, followed by four off dates. 24/48 places duty every third day. Their full-cycle nominal weekly averages can match while their dates differ.
Does the four-day break start on the same weekday?
No. The cycle lasts nine days, so its blocks move across the seven-day week. Use an actual anchor to see the dates.
Will it add my separately allocated Kelly days?
No. It repeats the documented nine-day sequence. Confirm any additional days off or changes separately instead of assuming they are automatically included.
Related information
Sources
Last checked:
